Know before you bid.
BidScore uses AI to analyze construction drawings in minutes — extracting quantities, breaking down trades, and flagging addendum changes before they cost you money.
No manual takeoffs. No spreadsheets. Just upload your drawing set and let BidScore do the work.
Here is an actual example of what BidScore extracts from a 28-sheet BC commercial & multi-family drawing package — complete with quantity takeoffs, regional trade cost ranges, and automatic addendum change detection.
| CSI Division / Trade | Auto-Extracted Quantities from PDF | Key Scope & Spec Flags | BC Regional Cost Range |
|---|---|---|---|
| Div 03 Concrete & Formwork | 412 m³ footings/slab · 34,800 kg rebar · 6,200 sq ft suspended slab | 32 MPa structural concrete; seismic tie-downs per BCBC | $485,000 – $535,000 |
| Div 06 Wood Framing & Mass Timber | 18,450 sq ft framing · 1,420 lin ft shearwalls · Glulam canopy beams | Engineered TJI floor joists; acoustic party-wall assemblies | $690,000 – $760,000 |
| Div 07–08 Envelope, Roofing & Glazing | 7,800 sq ft 2-ply SBS roof · 3,420 sq ft triple-glazed windows/storefront | BC Energy Step Code 3 triple-pane U-0.22 requirement flagged | $540,000 – $595,000 |
| Div 22–23 Mechanical, Plumbing & HVAC | 62 plumbing fixtures · 2× 10-ton RTUs · 16 suite HRV units | Updated in Addendum #2 (Sheet M-201 tonnage increase) | $615,000 – $675,000 |
| Div 26 Electrical, Fire Alarm & Low Voltage | 600A main service · 16 suite panels · 248 LED fixtures · 4 Level-2 EV | Updated in Addendum #2 (Sheet E-104 panel + EV rough-ins) | $445,000 – $490,000 |
Start free. Scale as you grow. No surprises.
Early access pricing — lock in your rate before public launch.
Partner with BidScore to offer AI-powered bid intelligence as a member benefit. Your members win more work. Your association delivers more value. Everyone wins.
Talk to us about a partnershipJoin Canadian contractors already using BidScore to save time,
reduce risk, and win more work.